New hydropower plant with Francis turbine power 350 kVA is successfully operating in Italy. We completed the project comprehensively – from design, equipment supply, engineering, and automation to final commissioning. The system is designed for high reliabilityoptimal utilization of the water source, and long-term operation with minimal maintenance requirements.
The hydropower plant incorporates the latest technological solutions for flow control, equipment protection, and advanced automatic operation algorithms. This ensures stable generation of clean electrical energy and meets the requirements of modern standards for renewable energy sources.
The project is suitable for investors seeking an efficient, automated, and long-term sustainable solution in the field of small and medium-sized hydropower plantsOur team takes care of the entire implementation – from conceptual design to final operational optimization.
For more information about the project or collaboration opportunities, you can contact us at:
matevz.lesjak@siapro.si

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia