CONTAINERIZED POWER PLANTS

A ready-to-deploy containerized hydroelectric power plant – quick installation with no construction work required.

ABOUT THE PRODUCT

A more affordable source of energy

With this unit, you can replace a diesel power source with a more affordable water-powered system. It provides reliable electricity for new facilities, mines, sawmills, tourist sites, and other operations in areas without access to the power grid.

This is a functional, safe, and robust solution for small hydroelectric power plants with capacities of up to 150 kW.

ChatGPT said: Key features, production, and commissioning

  • The unit is fully automated with a PLC and allows for remote monitoring and control.
  • ChatGPT said: A functional, safe, and robust solution for small hydroelectric power plants with capacities of up to 150 kW.
  • Electrical connections for individual consumers or a local grid (400 V or 230 V)
  • A short delivery time and fast commissioning thanks to standardization, pre-fabrication, and the absence of major construction works at the power plant site
  • Reduced design and customization costs
  • The unit can be quickly and easily put into operation on-site.

KEY ADVANTAGES

  • Simple container system – a KIT solution
  • Optimized transport in a standard 20’’ container
  • Fast and cost-effective – no need for constructing a building or a dam
  • No on-site equipment assembly required
  • A robust system for smaller rivers that do not require dams or flow regulation
  • Simple connection to the pipeline and the grid
  • The product can be put into operation quickly
  • Also suitable for drinking water systems

BROCHURES AND QUESTIONNAIRE

REFERENCES

Photos

Video

Siapro SHPP Compact fully automated containerised hydropower plant
We reserve all rights to the content and photographs on this website. Any use of the content, in whole or in part, is prohibited without prior written consent from Siapro. All photos ©Siapro.
SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved