
Technical details of the new hydropower plant:
- Gross drop: 306.5 m
- Net drop: 300.0 m
- Maximum flow rate: 310 l/s
- Generator: 760 kW, 0,4 +/- 5% kV, 1500 rpm
- Service valve DN300PN40
- Hydraulic power pack
Complete electrical equipment is also supplied.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia