Pelton horizontaln turbine 400 kW

A turbine with an asynchronous generator. The project was completed on a turnkey basis. We took care of the modelling and design of the equipment, the manufacture of the equipment, the necessary tests and carried out the final installation at the site of the new hydropower plant in Europe in Albania.

Other posts

SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved