Power plant upgrade with a Pelton turbine

We have delivered a new turbine for a Type 2 Jet Pelton hydroelectric power plant, Hn 118.5 m, Q 220 l/s. The turbines are equipped with an automated control system. VIDEO

Other posts

SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved