modernisation of a hydroelectric power plant

Hydropower plant reconstruction – a step forward in efficiency and automation

At Siapro, we successfully carried out a comprehensive reconstruction and modernization of a hydropower plant, focusing on the refurbishment and upgrade of the Pelton turbine. The project incorporates advanced technological solutions that ensure more reliable operation, improved regulation, and higher energy efficiency.

modernisation of the pelton turbine hydropower plant

As part of the reconstruction, we carried out:

  • complete automation the power plant operation,
  • advanced water level regulation,
  • remote monitoring and control system
  • and replacement of the main valve, which will allow for a higher flow rate.

Based on these improvements, we expect approximately 12–15% higher efficiency of the turbine, which represents a significant increase in production and operational stability.

The photos attached to the post show the individual phases of installation and testing, which took place during the execution of the project.

The hydropower plant reconstruction carried out by Siapro experts represents an important step toward more modern, efficient, and environmentally friendly operation of hydropower facilities.

Other posts

SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved