Category: New hydropower plants

Pelton vertikal turbine 929kW

The power plant is operating in Albania. The project was completed as a turnkey solution. Turbine power: 929 kW Net head: 122.5 m VIDEO
Read more

Kaplan turbine type S 300 kW

Siapro design, production, and installation of a Kaplan hydroturbine. The photo shows the hydroturbine prepared for shipment for final installation on the Eastern European market. Pre-assembly of the generator on the turbine was completed before shipping, along with successful…
Read more

Crossflow turbine, patent EP2642115

Successful start-up of an extremely efficient, technically upgraded double-flow radial turbine. The patent relates to an improved mechanism for regulating the water flow through the Banki turbine system. For more information about the product…
Read more

mHE Žaga

ChatGPT said: Preparation of the technical report, design, and complete turnkey project management Watercourse: Idrijca Head: 4.5 m Installed flow: 8000 l/s / Installed power: 310 kW Turbine type: 1 × Kaplan VIDEO
Read more

Turbine Francis 340 kW

New hydropower plant or new Francis turbine for a small hydropower plant, manufactured for the African market. Delivered and commissioned in 2013. Fully automated. Power: 340 kW Head: 38 m Flow rate: 1000 l/s – 1000…
Read more

mHE Kavčič

Design and supply of mechanical equipment for the power plant Watercourse: Idrijca Head: 3.8 m Installed flow: 1,400 l/s Turbine type: Francis – vertical Installed power: 39 kW
Read more
SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved