Category: Design and technical documentation

mHE Kogoj

Design and supply of mechanical and electrical equipment for a small hydropower plant Pelton turbine Year of construction: 1987 Hn = 65 m Q = 65 l/s Pipeline length = 440 m Maximum output power = 30 kW
Read more

mHE Hobovščica

Preparation of the technical report, design Watercourse: Hobovščica Head: 30 m Installed flow: 1,300 l/s Turbine type: 3 × Francis – horizontal Installed power: 440 kW VIDEO
Read more

mHE Cerknica II

Design of a small hydroelectric power plant Watercourse: the CerknicaFall: 125.5 mInstalled flow: 475 l/sTurbine type: the Pelton - verticalInstalled power: 486 kW
Read more

mHE Hladnik

ChatGPT said: Design of a small hydropower plant Stream: Kanomljica Head: 9 m Installed flow: 3,000 l/s Turbine type: Francis – vertical Installed power: 160 kW
Read more

mHE Močnik

Design, supply of mechanical equipment, and maintenance of the small hydropower plant Watercourse: Zapoška Head: 64 m Installed flow: 160 l/s Turbine type: 2 × Pelton – horizontal Installed power: 75 kW
Read more

mHE Kavčič

Design and supply of mechanical equipment for the power plant Watercourse: Idrijca Head: 3.8 m Installed flow: 1,400 l/s Turbine type: Francis – vertical Installed power: 39 kW
Read more

mHE Aljančič

Design Watercourse: Tržiška Bistrica Head: 22.5 m Installed flow: 1,500 l/s Turbine type: Banki Installed power: 300 kW
Read more

mHE Pristava

Preparation of technical reports Watercourse: Tržiška Bistrica Head: 8 m Installed flow: 5,000 l/s Turbine type: 2 × Francis – horizontal Installed power: 250 kW
Read more

mHE Heartburn

Preparation of technical reports Watercourses: Rajterbah and Klemenova Grapa Head: 190 m Installed flow: 33 l/s Turbine type: Pelton Installed power: 30 kW
Read more

mHE Jerala

Tubular turbine, preparation of technical reports Watercourse: Tržiška Bistrica Head: 3.1 m Installed flow: 2,500 l/s Turbine type: Tubular turbine Installed power: 63 kW
Read more
SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved