New Francis hydropower plant 350 kVA installed in Italy

Advanced solutions for reliable clean energy production

ABOUT THE PROJECT

New hydropower plant with Francis turbine power 350 kVA is successfully operating in Italy. We completed the project comprehensively – from design, equipment supply, engineering, and automation to final commissioning. The system is designed for high reliabilityoptimal utilization of the water source, and long-term operation with minimal maintenance requirements.

The hydropower plant incorporates the latest technological solutions for flow control, equipment protection, and advanced automatic operation algorithms. This ensures stable generation of clean electrical energy and meets the requirements of modern standards for renewable energy sources.

The project is suitable for investors seeking an efficient, automated, and long-term sustainable solution in the field of small and medium-sized hydropower plantsOur team takes care of the entire implementation – from conceptual design to final operational optimization.

For more information about the project or collaboration opportunities, you can contact us at:
matevz.lesjak@siapro.si

  • Start-up year: 2022
  • Turbine: Francis – vertical
  • Power: 350 kW

Interested in a similar project?

Contact us for professional advice or a quote for your hydroelectric power plant.
SIAPRO hydro logo
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to our newsletter
Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group - All rights reserved