
Pictured here are 100-year-old rotors that we have refurbished at Siapro.
Many of the old hydropower plants are in excellent condition. However, refurbishment can bring some key benefits in green energy, such as efficiency and profitability, as well as operational safety and control of the hydropower plant.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia